GESTIÓN DE RIESGOS APLICADA A INVERSIONES EN INFRAESTRUCTURA. ¿APORTE ESTRATÉGICO DE LA TERCERA MISIÓN DE LAS UNIVERSIDADES?
GESTIÓN DE RIESGOS APLICADA A INVERSIONES EN INFRAESTRUCTURA. ¿APORTE ESTRATÉGICO DE LA TERCERA MISIÓN DE LAS UNIVERSIDADES?
-
DOI: https://doi.org/10.22533/at.ed.46524270517
-
Palavras-chave: Riesgos, Proyectos, Misión, Hitos, Obras paralizadas.
-
Keywords: Risks, Projects, Mission, Milestones, Paralyzed works.
-
Abstract: According to the investigations carried out, the existence of a relationship between the execution of infrastructure projects and their performance as public works has been verified. Unfortunately, there have been paralyzed works (hospital projects), works with higher costs and deadlines; All these problems increase the public problems of the gap in basic access to infrastructure (short and long term), reported by the National Infrastructure Plan for Competitiveness. And when asked, who would be the most affected by this problem? Unfortunately: "The most affected are ordinary citizens." The cause that generates all this problem should be pointed out: “it is the non-application of risk management in the execution of investments in infrastructure projects; this deficiency results in unsuccessful projects. Another contribution is the existence of a direct relationship between the offer of the universities, the indication of mission (first, second, third and economic impact), levels and results of research, the solution of public problems, and the achievement of professionals with appropriate and necessary skills to solve the public problems of the country.
- Rubén Gómez Sánchez Soto