Artigo - Atena Editora

Artigo

Baixe agora

Livros

ADJUSTMENT OF TIME TO RESPONSE FROM THE CRIMINAL EXPERTISE

The measurement of the productivity of Criminal Experts in the Division of External Expertise of the Institute of Criminalistics Leonardo Rodrigues is dependent on the working relationship and the time of preparation. Therefore, it is essential to determine, as faithfully as possible, the time required for each type of report to be produced. The objective is to make the period available to public servants compatible and produce a regulated workload. The application of a questionnaire to the civil servants and the statistical treatment of the collected data are adequate ways of relating the report with a corresponding load for its preparation. Furthermore, knowing which activities take time and are not related to the core activity is necessary so that the manager can identify and eliminate them, or at least reduce them, aiming to make the process more efficient. The results achieved indicate that the relationship between the report and available workload needs to be readjusted and that the aforementioned activities demand considerable periods of time.

Ler mais

ADJUSTMENT OF TIME TO RESPONSE FROM THE CRIMINAL EXPERTISE

  • DOI: 10.22533/at.ed.216382327041

  • Palavras-chave: Expert Examination. Report. Productivity. Time

  • Keywords: Expert Examination. Report. Productivity. Time

  • Abstract:

    The measurement of the productivity of Criminal Experts in the Division of External Expertise of the Institute of Criminalistics Leonardo Rodrigues is dependent on the working relationship and the time of preparation. Therefore, it is essential to determine, as faithfully as possible, the time required for each type of report to be produced. The objective is to make the period available to public servants compatible and produce a regulated workload. The application of a questionnaire to the civil servants and the statistical treatment of the collected data are adequate ways of relating the report with a corresponding load for its preparation. Furthermore, knowing which activities take time and are not related to the core activity is necessary so that the manager can identify and eliminate them, or at least reduce them, aiming to make the process more efficient. The results achieved indicate that the relationship between the report and available workload needs to be readjusted and that the aforementioned activities demand considerable periods of time.

  • ALYSSON SANTOS DE CASTRO
Fale conosco Whatsapp