Artigo - Atena Editora

Artigo

Baixe agora

Livros

DESIGN AND MANUFACTURE OF A NUCLEATED BOILING CHAMBER FOR HIGH PRESSURES

Many engineering situations involve boiling processes. In the case of nucleated boiling, a more in-depth study is needed to improve its technical use of intensification and be able to minimize the risks.

involved in confinement when it is imposed by the

project, as this can lead to problems linked to the premature triggering of the critical flow, which represents the limit at which the system is operated in nucleated boiling. This course conclusion work aims at the design and construction of a nucleated boiling chamber having its working pressure limited to 60 bar. For the construction of the nucleated boiling chamber, the materials used are a mechanical tube used for the body of the equipment, and the other parts all made of SAE 1020 steel, being manufactured by the machining process, the union of the parts where necessary is made by screws with or without nuts and locknuts or by welding process. The chamber has two tempered glass hatches so that it can be seen inside during the tests carried out, thus being able to see

what happens in the refrigerant used for testing.

Ler mais

DESIGN AND MANUFACTURE OF A NUCLEATED BOILING CHAMBER FOR HIGH PRESSURES

  • DOI: 10.22533/at.ed.3172232207105

  • Palavras-chave: Nucleate boiling. Nucleate boiling chamber. pressure vessel. Pressure. boiling curve.

  • Keywords: Nucleate boiling. Nucleate boiling chamber. pressure vessel. Pressure. boiling curve.

  • Abstract:

    Many engineering situations involve boiling processes. In the case of nucleated boiling, a more in-depth study is needed to improve its technical use of intensification and be able to minimize the risks.

    involved in confinement when it is imposed by the

    project, as this can lead to problems linked to the premature triggering of the critical flow, which represents the limit at which the system is operated in nucleated boiling. This course conclusion work aims at the design and construction of a nucleated boiling chamber having its working pressure limited to 60 bar. For the construction of the nucleated boiling chamber, the materials used are a mechanical tube used for the body of the equipment, and the other parts all made of SAE 1020 steel, being manufactured by the machining process, the union of the parts where necessary is made by screws with or without nuts and locknuts or by welding process. The chamber has two tempered glass hatches so that it can be seen inside during the tests carried out, thus being able to see

    what happens in the refrigerant used for testing

  • Paulo Ricardo Godois
Fale conosco Whatsapp