Strategy technique The Implantation Functional in Compensation reactive Series modular
The present job presents the methodology developed for implantation of the use in Bank in capacitor series in mode expeditious, without to involve studies technical exhausting. O BCS designed has the flexibility in location in between feeders, as well as can be reproduced in large scale. The research presents a paradigm shift in the use of BCS, at the place in to meet one demand specific, feeders that could be candidates for installation, and a standard BCS was designed that meets most, at specific points. This methodology is a contribution technique for implantation and innovation of the use of BCS, and it is being developed in a project in Search and Development (R&D). At the time the CPFL concluded you studies and it is at phase in acquisition from materials and equipment for 3 BCS to be installed in 2021.
Strategy technique The Implantation Functional in Compensation reactive Series modular
-
DOI: 10.22533/at.ed.3172202213095
-
Palavras-chave: Compensation reactive Series, Planning, Series Reactive Compensation, Subsynchronous Resonance, Power in Short Circuit, Quality in Energy.
-
Keywords: Compensation reactive Series, Planning, Series Reactive Compensation, Subsynchronous Resonance, Power in Short Circuit, Quality in Energy.
-
Abstract:
The present job presents the methodology developed for implantation of the use in Bank in capacitor series in mode expeditious, without to involve studies technical exhausting. O BCS designed has the flexibility in location in between feeders, as well as can be reproduced in large scale. The research presents a paradigm shift in the use of BCS, at the place in to meet one demand specific, feeders that could be candidates for installation, and a standard BCS was designed that meets most, at specific points. This methodology is a contribution technique for implantation and innovation of the use of BCS, and it is being developed in a project in Search and Development (R&D). At the time the CPFL concluded you studies and it is at phase in acquisition from materials and equipment for 3 BCS to be installed in 2021.
- Guilherme Ferretti Rissi
- Fernanda Alves Cangerana Pereira
- Fernanda Trindade
- Mateus Teixeira Duarte
- Nelson C. Jesus
- Cíntia Veiga Claudio