ANALYSIS OF TIMES AND MOVEMENTS IN THE PANEL MANUFACTURING PROCESS.
ANALYSIS OF TIMES AND MOVEMENTS IN THE PANEL MANUFACTURING PROCESS.
-
DOI: 10.22533/at.ed.3173292324088
-
Palavras-chave: Productividad, estudio de tiempos, tiempo estándar
-
Keywords: Productivity, time study, standard time
-
Abstract:
The project was carried out in the board production area of a forestry company, this area receives the sheet metal from the dryers in order to improve it and remove the greatest number of imperfections it presents and thus obtain views of different types, they are processed and They assemble the various boards for both interior and exterior in their different thicknesses that are marketed among their clients. During the execution of this project, the patching area was analyzed, taking ten samples and later changing it to thirty, in order to have a more representative sample during the process. The number of leaves that were patched and the number of patches that were placed on each leaf were determined, obtaining averages of patches per leaf and the time required to patch one leaf. It was possible to increase the production of sheets by approximately 25% per hour, achieving as a result a higher daily production and with fewer movements for the operator. The causes that originated dead times were determined and solutions were presented. In the gumming area, the standard armed time was determined for each type of thickness in each of the gummers. The gumming cycle was analyzed, taking into account the press area to determine the loads per hour and dead times that occurred. Finally, data was collected from the patches that were detached from the already patched sheets, according to their classification, obtaining production indices from each of the operators.
- Carmen Liliana Chávez Sauceda
- Jorge Tomás Gutiérrez Villegas
- Hugo Chávez Moreno
- María Leticia Silva Ríos
- Jesús González Minjares
- Daniel Gilberto Torres Méndez